1. Adjust the direction of the geosynthetics so that the length of the material roll is perpendicular to the road.
2. The composite geotextile drainage net must be terminated, and the geotextiles on the adjacent geonet cores are overlapped along the material roll.
3. Connect the geonet cores of adjacent geomaterial rolls with white or yellow plastic buckles or polymer straps to connect the rolls. Attach a tape every 3 feet along the length of the roll of material.
4. The direction of the overlapped geotextile should be the same as the direction of the stuffing. If the geotechnical material is laid between the foundation / base and the sub-base, continuous wedge welding, flat head welding or stitching shall be performed to fix the upper layer of the overlapped geotextile. If sutured, it is recommended to use a flat seam or general seam to meet the stitch length requirements.